    黄俊,陈规划,李颖. 大藤峡水利枢纽工程“压咸补淡”“第二道防线”构建实践与思考[J]. 中国防汛抗旱,2024,34(11):36−39, 92. DOI: 10.16867/j.issn.1673-9264.2024364
    引用本文: 黄俊,陈规划,李颖. 大藤峡水利枢纽工程“压咸补淡”“第二道防线”构建实践与思考[J]. 中国防汛抗旱,2024,34(11):36−39, 92. DOI: 10.16867/j.issn.1673-9264.2024364
    HUANG Jun,CHEN Guihua,LI Ying.Practice and reflection on the construction of suppressing saltwater and replenishing freshwater and second line of defense in the Datengxia Water Complex[J].China Flood & Drought Management,2024,34(11):36−39, 92. DOI: 10.16867/j.issn.1673-9264.2024364
    Citation: HUANG Jun,CHEN Guihua,LI Ying.Practice and reflection on the construction of suppressing saltwater and replenishing freshwater and second line of defense in the Datengxia Water Complex[J].China Flood & Drought Management,2024,34(11):36−39, 92. DOI: 10.16867/j.issn.1673-9264.2024364

    大藤峡水利枢纽工程“压咸补淡”“第二道防线”构建实践与思考

    Practice and reflection on the construction of suppressing saltwater and replenishing freshwater and second line of defense in the Datengxia Water Complex

    • 摘要: 大藤峡水利枢纽工程(以下简称大藤峡工程)是集防洪、航运、发电、水资源配置、灌溉等功能于一体的珠江流域关键控制性工程,调度目标多、调度难度大。针对珠江河口咸潮活动威胁当地居民用水安全的不利局面,大藤峡工程作为珠江流域供水保障“三道防线”中的“第二道防线”,克服1936年以来大藤峡坝址入库水量第一枯水年(2023年)、涝旱急转等极端气候过程影响,2020—2024年先后实施16次应急水量调度,累计向澳门、珠海供水补水25.7亿m3,同时兼顾改善了河道生态、通航条件,有效保障了广西区域电力供应,充分发挥了流域骨干水库综合效益。全面总结2020—2024年大藤峡工程参与珠江流域“压咸补淡”应急水量调度实践经验,从水库调度角度出发分析存在的调度矛盾与解决措施,为同类型水库抗旱保供水调度提供参考。

       

      Abstract: The Datengxia Water Complex (hereinafter referred to as the "Datengxia Project") is a key control project in the Pearl River Basin integrating functions such as flood control, shipping, hydropower generation, water resource allocation, and irrigation with multiple regulation targets and great difficulty. In response to the adverse situation where salt tide activities at the Pearl River Estuary threaten the water safety of local residents, the Datengxia Project, as the second line of defense in the "three lines of defense" for water supply security in the Pearl River Basin, overcame the influences of extreme climate processes such as the first dry year(2023) of inflow at the Datengxia dam site since 1936 and the sudden turn of floods and drought. From 2020 to 2024, the 16 emergency water regulation operations were carried out successively with a cumulative water supply of 2.57 billion m3 of water to Macao and Zhuhai. At the same time, it also improved the river ecology and navigation conditions, effectively guaranteed the regional power supply in Guangxi Zhuang Autonomous Region, and gave full play to the comprehensive benefits of the backbone reservoirs in the basin. This paper comprehensively summarizes the practical experience of the Datengxia Project's participation in the emergency water dispatch for saltwater suppression and freshwater replenishment in the Pearl River Basin from 2020 to 2024. From the perspective of reservoir regulation, it analyzes the existing regulation contradictions and solutions, providing a reference for drought resistance and water supply regulation of the same type of reservoirs.

       

    /