收录期刊

    高级检索
    魏向阳, 杨会颖, 任伟, 韩涵. 2023年黄河含沙量调度探索与实践[J]. 中国防汛抗旱, 2024, 34(1): 68-72. DOI: 10.16867/j.issn.1673-9264.2023458
    引用本文: 魏向阳, 杨会颖, 任伟, 韩涵. 2023年黄河含沙量调度探索与实践[J]. 中国防汛抗旱, 2024, 34(1): 68-72. DOI: 10.16867/j.issn.1673-9264.2023458
    WEI Xiangyang, YANG Huiying, REN Wei, HAN Han. Exploration and practice of sediment concentration regulation in the Yellow River in 2023[J]. China Flood & Drought Management, 2024, 34(1): 68-72. DOI: 10.16867/j.issn.1673-9264.2023458
    Citation: WEI Xiangyang, YANG Huiying, REN Wei, HAN Han. Exploration and practice of sediment concentration regulation in the Yellow River in 2023[J]. China Flood & Drought Management, 2024, 34(1): 68-72. DOI: 10.16867/j.issn.1673-9264.2023458

    2023年黄河含沙量调度探索与实践

    Exploration and practice of sediment concentration regulation in the Yellow River in 2023

    • 摘要: 2023年汛前,黄河水利委员会联合调度干流万家寨、三门峡、小浪底,支流陆浑、故县、河口村水库实施了黄河汛前调水调沙。此次调水调沙在调度过程中着力细化优化三门峡、小浪底水库调度,精细控制小浪底水库水位和入出库流量、含沙量,采取支流水库加大清水汇入等方式,控制下游河道含沙量在合理范围内,减少了调水调沙高含沙洪水对水生生物及其栖息地的影响,避免了发生洪峰增值过大,保证了调水调沙安全可控,完成了预案设定的各项目标。

       

      Abstract: Before the flood season in 2023, the Yellow River Conservancy Commission jointly dispatched Wanjiazhai, Sanmenxia and Xiaolangdi reservoirs on the main stream, Luhun, Guxian and Hekoucun reservoirs on the tributaries of Yellow River to implement pre-flood water and sediment regulation. In the process of water and sediment regulation, efforts had been made to refine and optimize the regulation of Sanmenxia and Xiaolangdi reservoirs. The water level, inflow and outflow, and outflow sediment concentration of the Xiaolangdi reservoir had been carefully controlled, and measures such as increasing the inflow of clean water from tributary reservoirs had been taken to control the sediment concentration of the downstream river within a reasonable range. The impact of high sediment content floods on aquatic organisms and their habitats had been minimized, while avoiding excessive flood peak appreciation and ensuring the safety and controllability of water and sediment regulation, and all the goals set in the contingency plan were completed.

       

    /

    返回文章
    返回