收录期刊

    高级检索
    刘军梅, 杨毅, 郭金燕, 刘进, 张玉洁, 丛晓红, 王丽晶. 海河“23·7”流域性特大洪水北京市永定河洪水调查分析及对设计洪水的建议[J]. 中国防汛抗旱, 2024, 34(1): 52-57,63. DOI: 10.16867/j.issn.1673-9264.2023433
    引用本文: 刘军梅, 杨毅, 郭金燕, 刘进, 张玉洁, 丛晓红, 王丽晶. 海河“23·7”流域性特大洪水北京市永定河洪水调查分析及对设计洪水的建议[J]. 中国防汛抗旱, 2024, 34(1): 52-57,63. DOI: 10.16867/j.issn.1673-9264.2023433
    LIU Junmei, YANG Yi, GUO Jinyan, LIU Jin, ZHANG Yujie, CONG Xiaohong, WANG Lijing. Flood investigation and analysis of Yongding River, Beijing of Haihe "23·7" basin-wide extreme flood and suggestions on flood design[J]. China Flood & Drought Management, 2024, 34(1): 52-57,63. DOI: 10.16867/j.issn.1673-9264.2023433
    Citation: LIU Junmei, YANG Yi, GUO Jinyan, LIU Jin, ZHANG Yujie, CONG Xiaohong, WANG Lijing. Flood investigation and analysis of Yongding River, Beijing of Haihe "23·7" basin-wide extreme flood and suggestions on flood design[J]. China Flood & Drought Management, 2024, 34(1): 52-57,63. DOI: 10.16867/j.issn.1673-9264.2023433

    海河“23·7”流域性特大洪水北京市永定河洪水调查分析及对设计洪水的建议

    Flood investigation and analysis of Yongding River, Beijing of Haihe "23·7" basin-wide extreme flood and suggestions on flood design

    • 摘要: 受2305号台风“杜苏芮”影响,海河流域发生“23·7”流域性特大洪水,造成严重人员伤亡和财产损失。通过对北京市境内永定河全面开展降雨分析和洪水调查计算,并与设计雨量、历史洪水、实测洪水和设计洪水进行对比分析,确定永定河不同历时雨量、流量、洪量及重现期标准,结合本次暴雨洪水特点重点分析了永定河三家店至卢沟桥段洪水规律的变化情况。针对永定河防洪工程设计洪水工作中存在问题和“23·7”特大洪水实际,提出防洪工程设计洪水工作思路和建议,以期为防洪工程规划设计提供参考。

       

      Abstract: Under the influence of Typhoon Doksuri, the Haihe River basin has a large range and long lasting heavy rainfall process, resulting in Yongding River "23·7" catastrophic flood. In this paper, the rainfall analysis and flood investigation and calculation in Yongding River are carried out comprehensively, and the standards of rainfall, discharge, flood volume and recurrence period for different durations of Yongding River are determined through comparison and analysis with the designed rainfalls, historical floods, measured floods and designed floods, and the change of flood law between Lugouqiao and Sanjiadian section is analyzed in combination with the characteristics of this rainstorm flood. According to the existing problems in the design flood work of Yongding River flood control project and the reality of "23·7" catastrophic flood, this paper puts forward the ideas and suggestions of flood project design, and provides reference for the planning and design of flood project.

       

    /

    返回文章
    返回